Blog Detail

 Home / Blog Detail

Safe & Sturdy Floors Without Closing Your Doors.

When it comes to the areas that experience the most foot traffic and thus require the most attention paid to safety and cleanliness, the floors behind bars and in commercial kitchens stand out. The busier the area, the higher the risk for damage, employee slip accidents and hygiene issues; three headaches venues experience that can be largely reduced with the fast installation of a flooring surface that serves to combat each of them; with no downtime required. Developed in Germany and widely used across Europe for the last 20+ years in various restaurants, MMA (Methyl Methacrylate) technology is fast becoming a go-to product in the flooring industry worldwide; especially in bars, restaurants cafes and bathrooms due to its non-slip, seamless and fast curing qualities.

The resin-based technology of GRS (German Resin System) offers a variety of non-slip grades to choose from which means that floor surfaces that are exposed to water, grease and oil spills as well as continuous foot traffic from employees moving at maximum speeds, provides them with a safe workplace that adheres to WH&S standards. On top of its non-slip benefits, one of the vital elements of the product, paraffin, repels water, oil and grease as well as coffee, bubblegum and other sticky nuisances to flooring in kitchens and behind bars. It is also seamless which means that when it comes to cleaning up, there are no grout gaps for food substances to get caught in, cleaning becomes a fast and easy process, and health inspectors struggle to raise an issue.

 Instead of having to remove a concrete or tiled floor which can require grinding it back or completely taking out and replacing an entire kitchen; a process that can close businesses for days or even weeks, GRS Rapid Resin can be laid down on top of any surface while maintaining a consistent level, around appliances. With well-organised, calculated and executed installation, the GRS Rapid Resin is ready to go in just two hours and able to stand up to the rough and tumble of continuous traffic.
The installation process that requires accurate quantities and particular timing of the fast-curing substance is the key to its success. Australian-based ReadyFloor duo, Peter Armstrong and Daniel Chapman have perfected the art of GRS Rapid Resin installation after specialising in it within their business for the last few years.  
After a dinner trade of 180 people at the Travelodge Sydney Hotel, the ReadyFloor GRS Rapid Resin experts were in and out before the breakfast service of 300 people at 6 am; no time or trade lost.To know more visit our site http://allindiayellowpage.com.